Purchasing Department
2023-2024 Bids

B24-06 Roofing Project - Aptos Bldg 1100, Watsonville Bldgs A & B

Re-roof buildings B1100 Aptos, Watsonville A & B. Project will consist of but no limited to complete existing roof tear off, replacement of existing roof system with Garland supplied roofing products. B1100 roofing composition and miscellaneous roofing materials to be provided by contractor. Includes 3 Alternates.

Project Estimate: $850,000.00

Addendum No. 1 - B24-06 Roofing Project

Notice Calling for Bids

B24-06 Mandatory Pre-Bid Conference and Job Walk

Wednesday, April 24, 2024 10:00AM PST

B24-06 Roofing Project Job Walk Sign-In Sheet

Aptos Campus, Purchasing Office, Building 2030, 6500 Soquel Dr, Aptos, CA 95003

We will have the Pre-Bid Conference in the Purchasing Office, then walk to BLDG 1100 & Bldg Vapa 1000 (alternate).

After reviewing Bldg 1100 & Vapa 1000 we will travel to Watsonville to review Bldgs A & B.

RFI's are due on or before Thursday, May 2, 2024

B24-06 Request for Information

B24-06 Bid Due Date

Thursday, May 16, 2024, 2:00PM PST

B24-06 Bid Documents - Roofing Project

B24-06 Specifications

B24-06 Lead Paint Report Bldg 1100

B24-05 BLDG 1100 Room 1117 Dance Floor Renovations

Installation of a new sprung dance floor, and reconfiguration of dance studio.

B24-04 Children's Center Upgrades

Project Description for Bldg 1500 Children's Center Upgrades:

The proposed project consists of a demolition of the existing play structures, perimeter fence, and partition fences. Scope of work consists of but is not limited to:

Installation of new perimeter fence, partition fences, gates, viewing area for staff. Upgrades to one drinking fountain, one ADA path of travel, staff/student restroom ADA upgrades and hardscape upgrades for installation of new district provided playground equipment.

Installation of playground equipment to be done by district.

This project has been awarded to: 101 Builders, Inc.

B24-03 Bldg 600 Room 607 Fume Hood Upgrade

Project Description:

This project involves mechanical upgrades to ensure proper ventilation of the existing Fume Hoods in classroom 607.

This project has been awarded to: Kinetics Mechanical Service, Inc.


B24-02 Water Tank Relining and Repairs

This project involves the structural condition rehabilitation of an existing potable water storage tank.

Upgrades consist of restoring the existing roof rafters that exhibit significant section loss due to corrosion, and installing a flush cleanout and catch basin.

This project was awarded to: Spiess Construction Co., Inc.

B24-01 Watsonville A320 Classroom Modernization 2023-2024

This Project has been awarded to: Otto Construction

Procurement and General Services

Building 2030

6500 Soquel Drive

Aptos, CA 95003

placeholder
placeholder